PPP opportunities Tanzania: how a private firm or asset owner takes part.

How a private firm or asset owner takes part in a Mainland PPP: the open call, the unsolicited route, the special purpose vehicle, approvals and the 25 percent public stake cap.

A meeting around a table
DEAL DESK GUIDE
16minute read
8sources cited
8questions answered
Direct answer

How does a private firm take part in a PPP in Tanzania? Respond to an open call from a government body, usually an expression of interest, or propose a project of your own under the unsolicited rules. Form a special purpose vehicle before signing. The agreement needs approval from the PPP Steering Committee and vetting by the Attorney General, and a public body may hold no more than 25 percent of the vehicle.

A meeting around a table
A government partner is chosen through a written process. Preparation before the call opens is what separates a bid from a late application.

What the law says

Public private partnerships on the Mainland are governed by the Public Private Partnership Act, Cap. 103 R.E. 2023. It applies to Mainland Tanzania only (section 2). The Act defines a PPP as a contract in which a private party performs a function for a contracting authority for a set period. The private party takes on substantial financial, technical and operating risk. It is paid by the authority, by user charges, or by both (section 3).

A contracting authority is any ministry, government department or agency, local government authority, or public or statutory corporation. The Act is administered by the PPP Centre, which the Act calls a one stop centre (section 5(4)). The Centre's own site publishes the Act and its amendments, the PPP Regulations of 2020 and the 2023 amendment, and the live list of investment opportunities.

The rest of this guide follows the sections of the Act in the order a private party meets them. Where the Act is silent or sends a point to regulations, the guide says so and lists the point as one to confirm.

Who should read this

Owners of idle land, plant, trucks, buildings or technical teams who want a government project as a customer or partner. Contractors, developers and operators who need a clear path into a public site. Investors and family offices weighing a stake in a project company. Lenders and advisers who are asked to support a bid.

It is also written for the professionals Fursa365 introduces: advocates, valuers, accountants and engineers who will be asked to paper, price and test a bid. A PPP is a long contract with a public body, so every party in the consortium needs to understand the same process.

What did the Tanzania Buildings Agency announce?

On 16 July 2026 the PPP Centre posted that the Tanzania Buildings Agency (TBA) had invited local and international investors to submit expressions of interest for 38 government-owned sites under PPP. The sites sit in 20 regions and cover residential, commercial, mixed-use, logistics and transport, and hospitality and tourism uses. The Centre's notice names a 630-acre site at Nzuguni in Dodoma as a flagship.

The notice lists sites in Dar es Salaam at Canadian Village, Masaki, Oysterbay, Magomeni Kota and along Pugu Road in Ilala. Other named projects include a logistics and transport centre at Kana in Tanga, commercial buildings in Songea, residential projects in Kigoma and Tabora, and mixed-use developments in Simiyu, Geita and Shinyanga.

TBA says it seeks partners with proven financial and technical capacity and a strong record of delivery. Investors finance, develop and, where agreed, operate the projects on terms agreed with the Government. Expressions of interest are sealed. The notice states that eligibility rules and submission procedures are in the official EOI documents. The closing date is not stated in the notice, and a reader should treat it as unknown until they hold the EOI documents.

TBA was established under the Executive Agencies Act No. 30 of 1997, and the notice says an August 2023 amendment to its establishing Order allowed it to undertake commercial property development.

Which sectors and projects can be done as a PPP?

Section 4(5) of the Act lists the sectors: agriculture, infrastructure, industry and manufacturing, exploration and mining, education, health, environment and waste management, ICT, trade and marketing, sports, entertainment and recreation, natural resources and tourism, and energy. The list is stated as including but not limited to these.

The Centre's own opportunity list shows how wide the range is. Its published calls include the redevelopment of the Mwl. J. K. Nyerere Trade Fair Grounds, nine and two projects at the University of Dodoma, a beach resort, ferries, workshops of the government electrical and mechanical agency, and a call for equipment hire operators. The last of these, posted in October 2024, matters to owners of idle plant, because it shows a public body asking the private sector to supply equipment under the Act.

Government bodies also bring local projects to investors. The Citizen reported on 4 November 2026 that the PPP Centre held an investor meeting in Mbeya, where the city council pointed to a bus terminal at Uyole and an abattoir. The press summary gives the values as Sh20 billion and Sh10 billion. The full article could not be read, so the values are reported and not confirmed.

How does a government body pick its private partner?

Section 21(1) requires every PPP project to be procured through open and competitive bidding. The contracting authority first prepares a feasibility study. Section 13 requires that study to show the activity to be outsourced, the comparison of costs with and without outsourcing, that the agreement is affordable, that it gives value for money, and that appropriate risk passes to the private party. It also assesses whether the private party has the capacity and resources to deliver.

The contracting authority sends the project and its feasibility study to the PPP Centre (section 12(1)(c)). The Centre examines the request for proposals to check that it conforms to the approved feasibility study (section 5(1)(h)). The Steering Committee then approves the feasibility study and, later, the selection of the preferred bidder (section 8(1)(c)).

In practice the first public step is an invitation for expressions of interest, as in the TBA call. Qualified respondents are then invited to submit full proposals. The exact stages, evaluation criteria and timelines for solicited projects are set in the regulations under section 21(5), which the reader should open before preparing a response.

StageWho actsReference in the Act
Pre-feasibility study sent to the MinisterContracting authoritySection 4(6)
Feasibility study and project sent to the PPP CentreContracting authoritySection 12(1)(c)
Request for proposals checked against the feasibility studyPPP CentreSection 5(1)(h)
Open competitive biddingContracting authoritySection 21(1)
Preferred bidder approvedPPP Steering CommitteeSection 8(1)(c)
Agreement vettedAttorney GeneralSection 20
Agreement signedAccounting officer of the authoritySection 24(1)

What is an unsolicited proposal and when is it allowed?

A private party may propose a project nobody has advertised. Section 22 requires the proponent to carry out the feasibility study and submit it to the relevant contracting authority. The study must cover technical, financial, social, environmental and economic issues, and must state the project activities, the environmental issues, the benefit to the Government and the proponent's financial capacity.

Competitive bidding is the rule. Section 21(2) lets the Minister exempt an unsolicited project from it only if all of seven conditions are met. The project must be a Government priority and fit its strategic objectives. The proponent must not need a Government guarantee or financial support. The project must have unique attributes that justify skipping a tender. It must be of significant size and need substantial financing. It must show value for money, affordability and transfer of significant risk. It must bring wide social and economic benefit. The proponent must also commit to bear the cost of the feasibility study.

A solicited project can also be exempted from competition, but only on the recommendation of the Steering Committee and only where the project meets the same criteria and an extra condition applies: urgent need that could not have been foreseen, the proponent holds the intellectual property in a key technology, or the proponent has exclusive rights with no reasonable substitute (section 21(3)).

RouteWho starts itWho pays for the feasibility studyCompetition
Solicited, open bidContracting authorityThe authorityRequired
Unsolicited, exemptedPrivate proponentThe proponentSkipped only if the Minister exempts and all section 21(2) criteria are met
Solicited, exemptedContracting authorityThe authoritySkipped on Steering Committee recommendation and a further urgency, IP or exclusivity condition

Why must the partner form a special purpose vehicle?

Section 25(1) requires the private party to establish a special purpose vehicle (SPV) under the Companies Act before the PPP agreement is signed. The Act defines an SPV as a private company set up by the successful party to implement the project, with liability limited by shares. The Centre points investors to the BRELA online registration portal for SPV registration, and the Companies Act and forms are on the BRELA site.

A public entity may be a minority shareholder in the SPV, but section 25(2) caps its shares at 25 percent of the equity contribution. It must also show it can fund its equity and can bear and mitigate project risk. A consortium therefore plans for at least 75 percent of equity from private parties.

The SPV is also where the consortium members' contributions are recorded. A shareholders' agreement sets who puts in cash, who puts in assets, how the assets are valued, and what happens on exit. Zatra's guide to a joint venture shareholders' agreement covers the terms. Beneficial owners of the SPV must be filed with BRELA, as set out in Zatra's note on beneficial ownership compliance.

How can an idle asset owner take part without leading a bid?

Most owners of a truck fleet, a plot or a set of machines will not lead a PPP bid. They can still take part in three ways. First, join a consortium that is bidding, and contribute the asset as a lease, a hire arrangement or an equity contribution in kind. Second, supply the project company once it is formed, under a normal hire or offtake contract. Third, bring a site or a technical team to a lead bidder who needs it, as a project participation deal.

Fursa365 matches these positions. An owner lists the asset as a qualified offer on the idle assets desk, or a consortium lead posts a request on the project participation desk. A company sale or a share transfer in a project company sits on the business deals desk, and a sale that needs competing bids can run as a deal round. Zatra screens both sides, using the verification desk steps, and the parties sign the non-disclosure and non-circumvention agreement before names move. The NDNCA guide explains what it covers.

An asset contributed to an SPV needs a value that other shareholders accept. An independent valuation report is the usual basis, and the guide on valuation reports and deal documents sets out what such a report contains. Fursa365 does not value assets and does not hold money. Each party pays the other directly through its bank.

What goes into a PPP agreement?

Section 17(3) lists the minimum terms. The agreement must be in writing. It must set out the responsibilities of each party, the financial terms and how the private party's performance is managed. It must record the Government's undertaking to help obtain licences and permits, and the return of assets at the end. It must also cover the roles and risks of each side, payment flows, remedies for default, financial management duties, termination for breach, the conditions of service and the period of execution.

Section 17(4) adds conditions. The private party performs the authority's function for a specified period and bears the risks of performing it. An environmental impact assessment certificate must have been issued for the project. Government facilities and state resources the project needs must be made available on time. Public and private assets must be clearly specified.

Three further rules matter to every consortium member. The agreement is governed by the laws of Mainland Tanzania (section 17(5)). The private party's rights, obligations and controlling interests may not be transferred or assigned to a third party without the prior written consent of the contracting authority (section 17(6)), so a share sale in the SPV needs that consent. Land is acquired under the Land Act, the Village Land Act and the other land laws named in section 18.

Duration is fixed in the agreement. Section 19 allows extension only for delay or interruption beyond a party's control, for cost increases from unforeseen authority requirements, or where the service is still needed and the authority cannot take it over.

What approvals does a deal need, and how long do they take?

The Act sets time limits for each public step. The Minister forwards a pre-feasibility study to the PPP Centre within seven working days (section 4(7)). The Centre analyses it within 21 working days (section 4(8)). Section 5(2) separately says the Centre analyses pre-feasibility studies, requests for proposals, evaluation reports and agreements within 30 working days of receipt. The two periods are stated in different sections for what looks like the same stage, so a bidder should ask the Centre which it applies.

The Steering Committee approves feasibility studies, the selection of the preferred bidder and agreements within 21 working days of the Centre's recommendation (section 8(2)). It meets at least once every three months (section 7(5)). Every agreement goes to the Attorney General for a legal opinion (section 20) and is signed by the accounting officer only after Steering Committee approval and vetting (section 24(1)). Where the project needs public funding, Government support or a policy decision, the Steering Committee refers it to the Minister, who has 21 working days to determine it (section 9).

The Minister must tell the public of approved projects through the Gazette, a newspaper of wide circulation or public media (section 10(1)). A small scale PPP project, defined as one not exceeding USD 20 million, is analysed and approved by accounting officers under the Minister's directives (sections 3 and 10(3)).

Mainland and Zanzibar

The Act applies to Mainland Tanzania only. A project in Zanzibar does not run under Cap. 103, and a Mainland approval does not cover it. Zanzibar's own investment and public partnership arrangements, and the authority that handles them, were not reviewed for this guide. A consortium with a Zanzibar element should ask a Zanzibar advocate which rules apply before it commits.

PointMainlandZanzibar
Governing PPP lawPublic Private Partnership Act, Cap. 103 R.E. 2023Not covered by this Act; confirm with a Zanzibar advocate
Central coordinating bodyPPP Centre and PPP Steering CommitteeNot reviewed
Governing law of the agreementLaws of Mainland Tanzania (section 17(5))Set by the Zanzibar arrangement
LandLand Act and Village Land Act (section 18)Zanzibar land law applies; handled separately

A worked example: a USD 15 million site with a 25 percent public stake

This worked example is illustrative and uses round figures. A Mainland logistics site is offered under PPP at an estimated project cost of USD 15 million. That is below the USD 20 million line in section 3, so the project may be a small scale PPP. A lead developer forms an SPV with USD 4 million of equity and plans for the public entity to take the maximum 25 percent stake.

Equity holderContributionShare of SPV equity
Public entity (maximum under section 25(2))USD 1,000,00025 percent
Lead developer (cash)USD 2,400,00060 percent
Truck fleet owner (assets in kind, independently valued)USD 600,00015 percent
TotalUSD 4,000,000100 percent

The private parties together hold 75 percent. The remaining USD 11 million of project cost is raised as debt by the SPV from a lender the consortium chooses, and Fursa365 does not lend or arrange credit. If the fleet owner later wants to sell the 15 percent, section 17(6) means the contracting authority must consent in writing before the transfer. The fleet owner also needs the valuation, the shareholders' agreement and the advocate's advice on paper before signing, because the share price depends on the valuation.

No government fee is quoted in this example. Incorporation, registration and licence fees for the SPV are taken at the official rate from the fees page and the government fee register, and they are separate from Zatra's professional fee.

What can go wrong?

  • A bid is prepared against an expired call. The TBA notice gives no closing date, and the calls listed on the PPP Centre site date back to 2024. Confirm a closing date in writing before spending on a proposal.
  • The consortium plans a public stake above 25 percent. Section 25(2) caps it, and the structure then fails before it reaches the Steering Committee.
  • An unsolicited proposal assumes a guarantee or subsidy. Section 21(2)(b) requires that the proponent need none of it.
  • An asset is contributed without an independent valuation. Other shareholders can later dispute the share it earned.
  • A share sale in the SPV is agreed without the authority's consent. Section 17(6) requires prior written consent.
  • A party has a private interest in the project. Section 32 makes undisclosed interests of Steering Committee members, PPP Centre officers and authority officers an offence, and section 36 sets the general penalty at TZS 5 million to TZS 50 million, or three months to three years in prison, or both.
  • The project touches natural wealth and resources. Section 34 requires the project to take account of two further Acts on permanent sovereignty and on the review of unconscionable terms.

What to do now

  1. Get the official documents: open the PPP Centre's list of calls and request the EOI documents for any site that fits, and read the PPP Regulations of 2020 as amended in 2023.
  2. Confirm the closing date with the contracting authority or the PPP Centre in writing, and note the eligibility rules in the EOI documents.
  3. Decide your role: lead bidder, consortium member contributing an asset, or supplier to the project company.
  4. Prepare your evidence: company documents, financial statements, a track record, title or registration for each asset, and an independent valuation of anything you will contribute.
  5. Plan the SPV: private equity of at least 75 percent, a shareholders' agreement drafted by an advocate, and the beneficial ownership filing at BRELA.
  6. List and match on Fursa365: list the asset or the request, let Zatra screen it, sign the NDNCA before names move, run your own third-party due diligence, and have an advocate draft the agreement.

Key dates

ItemDate or time limit
TBA call for expressions of interest, 38 sitesPosted 16 July 2026; closing date not stated
PPP Act, Cap. 103, commencement26 May 2011 (GN. No. 156A of 2011); revised edition 2023
Minister forwards pre-feasibility studyWithin 7 working days (section 4(7))
PPP Centre analysis21 working days (section 4(8)) or 30 working days (section 5(2))
Steering Committee approvalWithin 21 working days of the Centre's recommendation (section 8(2))
Steering Committee meetingsAt least every three months (section 7(5))

How Zatra helps

The group works as a chain, within the limits on the regulatory boundaries page. Fursa365 matches qualified offers with demand verified by Zatra Consultants Limited. Zatra structures the deal, NEMBO packages it, and Kasongo Auction Mart runs an auction where a sale needs one. Zatra screens the owner's right to offer, checks the documents and verifies a consortium lead's identity and mandate before an introduction. It does not value assets, license anyone, lend, hold money or sit as a party to the PPP.

The client runs its own third-party due diligence, and an advocate drafts the shareholders' agreement and any lease or hire contract. Matching is free of charge. If the client engages Zatra as its adviser, the professional fee is set in a Success Fee Protection Agreement and is not brokerage. Government fees are paid at the official rate and kept separate from that fee. Zatra does not decide or guarantee any authority's outcome, and the PPP Centre, the Steering Committee and the Attorney General decide their own matters.

Sources and status

Accurate as at 7 Nov 2026. Figures are from the sources below and from the Zatra government fees register, quoted with their register IDs so they can be checked line by line.

Figures to confirm before you act

  • PPP Act sections 4, 5, 8, 17, 21, 22 and 25 as numbered in the R.E. 2023 edition
  • Small scale PPP threshold of USD 20 million (section 3)
  • Maximum public entity share of SPV equity: 25 percent (section 25(2))
  • Time limits of 7, 21 and 30 working days in sections 4 to 9
  • General penalty of TZS 5 million to TZS 50 million (section 36)
  • Closing date and eligibility rules in the TBA EOI documents (not stated in the notice)

General information prepared by the Fursa365 deal desk, Zatra Consultants Limited. It is not legal, tax or investment advice and does not decide or guarantee any authority's outcome. Confirm current rules and fees with the authority named and your own advocate before you act. Mainland Tanzania is described; Zanzibar has separate laws and bodies.

Questions readers ask

Does the PPP Act apply in Zanzibar?

No. Section 2 says the Act applies to Mainland Tanzania. A Zanzibar project follows Zanzibar's own arrangements, which this guide does not cover. Ask a Zanzibar advocate which rules and which authority apply before committing to a project there.

Can a small business take part in a PPP?

Yes, usually as a consortium member or a supplier. Smaller projects, up to USD 20 million, are approved by the authority's accounting officer under Ministerial directives. A small firm should confirm the capacity tests in the EOI documents before applying alone.

Is an expression of interest binding?

The notice describes sealed expressions of interest used for partner selection, not a signed agreement. Whether an EOI binds the bidder depends on the EOI documents, which the notice says hold the rules. Have an advocate read them before you submit.

Can the Government hold more than 25 percent of the project company?

A public entity may be a minority shareholder in the SPV, capped at 25 percent of the equity contribution under section 25(2). It must also show it can fund its equity and carry the project risk.

What is an unsolicited proposal?

It is a project a private party proposes without a government call. It must pass seven conditions in section 21(2), including that it needs no Government guarantee and that the proponent pays for the feasibility study. The Minister decides on the exemption from competitive bidding.

Can I sell my share in the project company later?

Only with the prior written consent of the contracting authority. Section 17(6) bars transfer or assignment of the private party's rights, obligations or controlling interests to a third party without it. Plan exit rights in the shareholders' agreement.

Does Fursa365 lend money for a PPP bid?

No. Fursa365 never lends, never holds money and does not arrange credit. It matches qualified offers to demand verified by Zatra. Parties arrange finance with lenders of their own choice and pay each other directly.

How long does government approval take?

The Act sets 7 working days for the Minister, 21 or 30 for the PPP Centre, and 21 for the Steering Committee at each step. Attorney General vetting has no stated limit in the sections read, so plan for months, not weeks.

Seen an error or a changed fee? Write to [email protected] with the guide title and the line. The desk reviews every guide quarterly and on any change in the law.
Joseph Marwa, Zatra Consultants Limited
Joseph MarwaChief Executive Officer, Zatra Consultants Limited

Tanzania market entry, corporate governance and regulated-sector route decisions. Certified Financial Educator with more than twelve years in the financial sector.

Ready to act on this guide?

Submit a qualified offer or a verified request. Zatra screens it; only verified counterparties ever see it.