What is a contract mining agreement in Tanzania? It is a written contract in which an equipment owner or contractor mines or hauls for a licence holder, paid by a rate or a share of output. The holder stays the miner and pays royalty. On a primary mining licence, GN 260 of 2025 sets registration with the Mining Commission, a 30 percent minimum share for the holder and a three year term.

What the law says
A contract mining agreement Tanzania parties sign sits on four layers of law. The first is the Mining Act, Cap. 123. In the TanzLII consolidation to 30 November 2019, section 8(2) reserves a primary mining licence (PML) for citizens and for companies they control from inside Tanzania. Section 8(3) lets the Commission allow a PML holder to contract a foreigner for technical support that is needed and cannot be found locally. Section 55(3) gives the PML holder the exclusive right to mine, exercised through servants and agents who are not disqualified. Section 18(1) bars anyone except a right holder, dealer or broker from possessing or disposing of minerals, unless as an employee, agent or contractor holding them for an authorised holder. The Act text is on TanzLII.
The second layer is the Technical Assistance Regulations, GN 260 of 25 April 2025, signed on 17 April 2025. They apply to PML holders and require a written agreement with a "facilitator", registered by the Mining Commission. Summaries by Clyde & Co and Bowmans agree on the main points.
The third layer is local content: GN 3 of 2018 as amended by GN 563 of 2025, and the list of services reserved for wholly Tanzanian-owned companies. The fourth is the payment and safety law around the mine. This guide covers Mainland Tanzania. Zanzibar has its own mineral, quarry and workplace safety laws, which an advocate must confirm where a Zanzibar site or party is involved.
Section numbers follow the TanzLII consolidation. The Revised Edition 2023 renumbers some sections; royalty is section 111 and the inspection fee section 115 there. Check the edition before a number goes into a contract. For wider structures see partnering on a primary mining licence.
Who should read this
Owners of excavators, loaders, drills, crushers and tippers who want paid work at a mine. Haulage firms that want a mining contract in place of spot hire. Holders of PMLs, mining licences and special mining licences who lack plant or working capital. Banks and lessors that financed the machines. Advocates, geologists and accountants advising any of them.
How does contract mining differ from a joint venture, a lease or plain equipment hire?
The test is who mines in law, who holds the licence and who carries the grade risk.
| Arrangement | Contractor is paid by | Grade risk | Licence changes hands |
|---|---|---|---|
| Contract mining, services | A rate per tonne, per bank cubic metre (bcm) or per hour | Holder | No |
| Contract mining with output share (technical support on a PML) | A share of gross profit; holder keeps at least 30 percent | Shared | No, unless licences are merged under GN 260 reg 9 |
| Joint venture | A share of profit or equity | Shared | Possible; consent where the Act requires it |
| Equipment hire or lease | Rent for the machine, with or without operator | Hirer | No |
Joint ventures are covered in the structuring guide and the mining joint venture guide. Hire without mining duties is covered in the equipment hire guide. In contract mining the contractor does the work, but the licence, the ore and the statutory charges stay with the holder.
Does a contract mining agreement need Mining Commission approval?
For a PML, GN 260 reg 4 says technical assistance is provided only under a written agreement between the holder and the facilitator. Technical assistance means mining expertise, machinery and equipment, how to operate them, and mining knowledge not available in Tanzania. The Resident Mines Officer inspects the licence and reports to the Commission (reg 6). The Commission registers the agreement and must notify the applicant if it refuses (reg 14). A breach by the holder exposes the licence to action under section 63 (reg 22).
Conditions are specific. One agreement covers up to ten PMLs in the same area (reg 5). The initial term is up to three years from registration, with renewal sought three months before expiry (reg 13). The Swahili text caps total renewals at twelve years and ties them to the licence term; one law firm summary says ten, so read the Gazette. The agreement may be in Swahili or English under Tanzanian law, and amendments need Commission approval (regs 15, 17, 19).
For a mining licence or special mining licence, section 9(2) requires the licensing authority's written consent to assign the licence. A service contract that leaves the licence with the holder is not an assignment. Whether a plain fee-for-service haulage or hire contract with a PML holder counts as technical assistance is not settled in the sources read. Treat any deal where the contractor runs mining operations, brings machinery to the licence area or shares in output as within GN 260 until the Commission or your advocate says otherwise. Whether a registration fee applies is unknown; the register shows USD 500 to register a document under GN 1 of 2018 (register ID NEW-06-16).
Which payment basis fits the work?
Pick one basis for each activity and say how quantity is measured. These bases are commercial practice, not statute. Grant Thornton Australia describes schedule of rates contracts as predetermined unit prices for people, equipment and materials. The bands below are illustrative only and vary by region, haul distance, fuel and ground.
| Basis | Used for | Illustrative band | Control to write in |
|---|---|---|---|
| Per tonne moved | Ore haulage and loading | TZS 6,000 to 9,000 a tonne on a 10 to 20 km haul | Weighbridge or truck tally signed daily |
| Per bcm | Overburden and waste stripping | TZS 8,000 to 14,000 a bcm | Monthly survey by a named surveyor |
| Per machine hour | Excavators, loaders, drills on call | TZS 180,000 to 260,000 an hour for a 20 tonne excavator with operator and fuel | Hour meter or tracker logs, monthly minimum hours |
| Share of output or gross profit | Whole-of-mine work under technical support | Holder at least 30 percent (GN 260 reg 9) | Joint assay, sales route and signed monthly reconciliation |
| Hybrid | Fixed minimum plus share above a trigger | Parties set both parts | Floor, trigger and cap stated as numbers |
Where GN 260 applies, reg 9 gives the holder at least 30 percent of gross profit after royalty, inspection fees and government levies, whatever operating costs the facilitator incurred. A contractor cannot price cost-plus and deduct costs ahead of the holder's share. A per-unit price without a measurement method invites disputes, so state the unit, the instrument, who reads it and the tolerance.
Who pays royalty, the inspection fee and the other statutory charges?
The law puts royalty on the miner, not the contractor. Section 87(1) of the Act as consolidated says every authorised miner pays royalty, and section 87(2) says the dealer or broker pays it where production is sold to one. Under GN 84 of 2026, published on 20 March 2026, a holder of a mineral right, broker licence or dealer licence declares production on Form MTF 23 and pays royalty and inspection fee before the minerals are sold or consumed. GN 260 reg 8 repeats the point for PML holders: the holder pays all government levies, royalties and fees.
| Charge | Rate or amount | Register ID |
|---|---|---|
| Royalty, gold and metallic minerals | 6 percent of gross value; 4 percent on gold sold at refinery centres or to the Bank of Tanzania | F0624 |
| Inspection fee | 1 percent of gross value, before clearance | F0625 |
| HIV Response Levy | 0.1 percent of gross value, paid with royalty | F0626 |
| PML annual rent, gold and gemstones | TZS 90,000 a hectare, minimum TZS 180,000 under 2 ha | F0620 |
| Withholding on purchases from PML holders | 2 percent, final, deducted by the buyer | F0629 |
The statutory payer and the economic bearer can differ. A contract can take royalty, inspection fee and the levy off the sales pool before the split, which is the reg 9 method. It cannot move the legal duty from the holder to the contractor. Require that charges are paid from proceeds at the point of sale, so no ore leaves site unpaid. Whether the 2 percent withholding is a "government levy" for reg 9 is unknown; settle it in the contract and confirm with an accountant.
Deputy Minister Steven Kiruswa told the National Assembly on 4 November 2026, as reported by Daily News, that licence holders have no authority to collect royalties from small-scale miners. A clause that lets anyone collect "royalty" in cash is unsafe.
What do the local content rules ask of a contract miner?
The Mining (Local Content) Regulations, 2018 require a contractor, subcontractor, licensee or allied entity to file a local content plan when applying to undertake mining activity (reg 10). They do not mention primary licences, so whether the plan duty reaches a PML holder is unclear. Only Tanzanians may fill junior and middle positions, including foremen and supervisors (reg 22).
GN 563 of 2025, signed on 29 August and published on 12 September 2025, adds three points. A non-indigenous company supplying a contractor, subcontractor or licensee must form a joint venture with a wholly Tanzanian-owned company holding at least 20 percent (reg 8(6)). That joint venture agreement goes to the Commission for approval before mining starts (reg 8(7)). The Commission must publish a list of services reserved for wholly Tanzanian-owned companies (reg 13A). Clyde & Co numbers the provision slightly differently; follow the Gazette.
The Minister's statement of 5 January 2026 lists twenty reserved items from the first phase, announced on 14 November 2025. Item 13 reads "Owner Mining Prohibited in favour of Contract Mining – Surface operations", covering open cast mining services including contract mining, drilling, blasting and haulage. Item 6 is haulage and logistics, and item 16 covers crushing and haul roads. A contractor offering surface mining services to a mine should therefore be wholly owned by Tanzanians. Whether the list reaches PML holders is unknown; ask the Commission. A citizen who fronts for a foreign operator risks the offence in reg 49(2) of the 2018 text. See also the local content guide for idle trucks.
What equipment, safety and environmental standards belong in the agreement?
The Act lets the Commission inspect health and safety in mining operations (section 22(f)), and PML rights are subject to the safety and environment regulations (section 55(3)). I could not verify a mining-specific safety regulation with a citable number, so that point is unknown. The advocate should confirm it before the safety schedule is drafted.
The Occupational Health and Safety Act, Cap. 297, applies to workplaces generally. As consolidated on TanzLII, it requires workplace registration before operating (section 16(1)), safety representatives where an employer has more than twenty employees (section 11) and fencing of machinery (section 25). The annual inspection fee for mining and quarrying runs from TZS 160,000 to 1,440,000 by size band (register ID F0442). The contractor that employs the crew pays workers compensation at 0.5 percent of earnings (register ID F0281). Zanzibar workplaces fall under Act No. 8 of 2005.
GN 260 adds duties for registered agreements, as I read them in the Swahili text. The facilitator lists supplied equipment in the agreement and plans its handover (reg 7). It files an environmental plan within 120 days and a mine development plan within 90 days of consent, and keeps a permanent representative. Equipment arrival is notified to the Resident Mines Officer (reg 11). The holder stays responsible for compliance even where management is joint (reg 10). For each machine, list:
- Make, model, serial number, and ownership proof or lessor consent.
- Insurance for machine, third parties and crew; see the insurance guide.
- Operator licences; see the plant operator guide.
- Maintenance intervals, availability targets and the remedy below them.
- Blast, haul road and rehabilitation duties, with NEMC permits (nemc.or.tz).
How do the contractor and the holder protect their machines and ore?
The contractor's excavators sit on a site it does not control, and the holder's ore leaves in the contractor's trucks. Four clauses cover most of the exposure.
- Title to plant. Machines stay the contractor's or its lessor's. GN 260 reg 7(4) lets a facilitator remove equipment if the agreement ends through the holder's deliberate act or negligence. Write the removal procedure and access rights in full.
- Ore never belongs to the contractor. Section 18(1) lets a contractor hold minerals only for an authorised holder. Bar sale, pledge or export by the contractor, and require delivery to a named plant, market or dealer.
- Joint measurement. Weighbridge tickets, assays and sales receipts are signed by both sides.
- Lender consent. A machine under a bank charge needs the bank's written consent; see the guide on pledging a mining licence.
Sales go through licensed channels; see the mineral offtake guide.
A worked example: an excavator and two tippers on a gold PML in Geita
A Mwanza contractor owns a 20 tonne excavator and two 16 cubic metre tippers, idle since a road contract ended. A Geita PML holder has a 9.5 hectare gold licence, paid up (annual rent TZS 855,000 at TZS 90,000 a hectare, register ID F0620), with a working face and no plant. After the NDNCA, their advocate drafts a technical support agreement under GN 260. The contractor supplies plant, fuel and operators. The holder supplies licence, site and local labour. The figures are illustrative for one month, not market data.
| Line | Basis | TZS |
|---|---|---|
| Gross value of sales | Assumed | 120,000,000 |
| Royalty | 6 percent (F0624) | 7,200,000 |
| Inspection fee | 1 percent (F0625) | 1,200,000 |
| HIV Response Levy | 0.1 percent (F0626) | 120,000 |
| Pool for the split | Sales less the three charges | 111,480,000 |
| Holder, minimum 30 percent | GN 260 reg 9 | 33,444,000 |
| Contractor, up to 70 percent | Balance | 78,036,000 |
| Contractor's operating cost | Fuel, crew, maintenance, assumed | 48,000,000 |
| Contractor margin before tax | Share less cost | 30,036,000 |
| Withholding by the buyer | 2 percent of 120,000,000 (F0629) | 2,400,000 |
A holder share of 40 percent would give the holder TZS 44,592,000 and the contractor TZS 66,888,000. The holder may not go below 30 percent. The 2 percent withholding is the seller's tax, and the agreement should say whether it comes off the pool or off the holder's share.
Compare a fee-for-service route. The contractor hauls and loads 6,000 tonnes a month at TZS 7,500 a tonne, which is TZS 45,000,000, and the holder keeps all gold sales and grade risk. Withholding on that fee is 5 percent as a service fee (F0212) or 10 percent as technical or management services to mining (F0213), meaning TZS 2,250,000 or 4,500,000. An accountant decides the rate. A plain rental of the plant attracts 10 percent on rent of construction equipment (F0216).
How do termination, step-in and default work?
GN 260 reg 16 lets either party end a registered agreement on 30 days' written notice for five reasons: dissatisfaction with performance, depletion of minerals in the licence area, fraud such as theft of minerals or equipment or falsified production figures, cancellation of the licence, and expiry of the licence without renewal. Disputes go first to negotiation and then to the competent legal bodies (reg 20). I found no statutory step-in right for a lender or replacement contractor, so any step-in must be contractual. Grant Thornton Australia notes that contract miners protect credit with step-in rights and second-ranking security. A Tanzanian agreement should cover:
- Payment default. A grace period, interest, suspension of work, then termination, with proceeds applied in a fixed order.
- Performance default. Availability or tonnage floors, a cure period and a replacement right for the holder.
- Licence events. Rent unpaid, renewal missed, suspension or cancellation end the work and trigger equipment handover.
- Step-in. A named lender or replacement contractor takes over on the same terms.
- Exit. Return of equipment, final measurement, settlement and rehabilitation.
- Disputes. Negotiation, then expert determination on measurement and arbitration on the rest; see the arbitration clause guide.
Disputes, seizure of machines or ore, prosecution and legal opinions go to an advocate.
What is settled, what to verify and what is unknown?
| Status | Proposition |
|---|---|
| Settled | PMLs are reserved for citizens; foreign technical support needs Commission permission (section 8). A contractor may hold minerals only for an authorised holder (section 18(1)). |
| Settled | GN 260 of 2025 requires a registered written agreement, a 30 percent minimum holder share, a ten-licence limit, a three-year term and 30-day termination grounds. |
| Settled | The holder or dealer pays royalty and inspection fee before sale (GN 84 of 2026). GN 563 of 2025 added the 20 percent joint venture rule. |
| Verify | Whether a fee-for-service haulage or hire contract needs GN 260 registration; the renewal cap; whether the reserved list reaches PML holders; the registration fee; Revised Edition 2023 section numbers. A May 2026 report of a nationwide audit of technical support agreements comes from one advocacy-toned source. |
| Unknown | The mining safety regulation citation; whether the 2 percent withholding is a levy under reg 9; the Commission's registration timeline; penalties beyond section 63; the Zanzibar position. |
What to do now
- Confirm the licence: print the status and the latest rent receipt from the Mining Commission portal this week, and check for disputes.
- Classify the arrangement: decide with an advocate whether it is services at a rate, technical assistance with an output share, or a joint venture.
- Check ownership: for a reserved service, confirm the contractor is wholly Tanzanian-owned, with beneficial ownership filed at BRELA.
- Verify the ground: commission a site visit with a geologist and surveyor before plant moves.
- Choose the payment basis: write the unit, the measurement method and the order in which charges come off proceeds.
- Write the exit: termination grounds, equipment handover, step-in and the dispute route.
- List on Fursa365: owners offer plant and holders state demand, each with evidence and an end date, so Zatra can match verified parties.
- Sign the NDNCA, then the agreement: names move only after the NDNCA, an advocate drafts the agreement, and the parties apply for Commission registration where GN 260 applies.
Key dates
| Item | Date or timing |
|---|---|
| GN 260 of 2025 (technical assistance) | Signed 17 April 2025; notice dated 25 April 2025 |
| GN 563 of 2025 (local content amendment) | Published 12 September 2025 |
| First reserved list under reg 13A | Announced 14 November 2025; statement 5 January 2026 |
| GN 84 of 2026 (royalty declaration) | Published 20 March 2026 |
| Registered agreement term | Up to three years; renewal application three months before expiry |
| Royalty and inspection fee | Before each sale or consumption of minerals |
| PML annual rent | Yearly, on the anniversary of grant |
How Zatra helps
Zatra Consultants Limited screens each mining listing for licence status, owners, citizenship and beneficial ownership, and verifies the demand or the plant before a match is shown. As the client's adviser under a Professional Services and Fees Agreement (PSFA), Zatra structures the arrangement, coordinates the geologist, surveyor and advocate the client chooses, runs the data room and records completion. Clients run their own third-party due diligence.
Two cost buckets apply. Government fees are paid at the official rate: Commission fees, royalty, inspection fee, NEMC and OSHA charges, and tax. Zatra's professional fee is separate and sits under the PSFA; see the fees page. Fursa365 does not hold money, lend, or act as a buy-and-sell marketplace, and the success fee is a professional fee, not brokerage. Introductions are not employment. Zatra does not insure, license, value, lend or hold money, does not mine, buy or sell minerals, and does not decide or guarantee any authority's outcome. Zatra Consultants Limited is the registered data controller under the Personal Data Protection Act. Disputes, seizure, prosecution and legal opinions go to an advocate; tax goes to an accountant.
Related routes are idle assets, business deals, project participation, skills, deal rounds, the auction room and verification. Zatra's notes on withholding on local payments and ownership checks add detail, and the NDNCA guide explains the first step.
Sources and status
Accurate as at 26 Nov 2026. Figures are from the sources below and from the Zatra government fees register, quoted with their register IDs so they can be checked line by line.
- Mining Act, Cap. 123, consolidated text as at 30 November 2019. TanzLII, consolidated 30 November 2019. Accessed 26 Nov 2026.
- GN 260 of 2025, Technical Assistance Regulations for small-scale mining licence holders (Swahili text). Ministry of Minerals, 25 April 2025, copy hosted by VELMA Law. Accessed 26 Nov 2026.
- Tanzania enacts the Mining (Technical Support to Small Scale Miners) Regulations, 2025. Clyde & Co, 16 May 2025. Accessed 26 Nov 2026.
- Technical support for primary mining licence holders, regulations published. Bowmans, 7 May 2025. Accessed 26 Nov 2026.
- GN 563 of 2025, Mining (Local Content) (Amendment) Regulations, 2025. Government Notice of 12 September 2025, copy hosted by FB Attorneys. Accessed 26 Nov 2026.
- GN 3 of 2018, Mining (Local Content) Regulations, 2018. TanzLII, published 10 January 2018. Accessed 26 Nov 2026.
- Amendment to the Mining (Local Content) Regulations 2018 by GN 563 of 2025. Clyde & Co, 18 September 2025. Accessed 26 Nov 2026.
- Minister for Minerals, media statement on local content. Ministry of Minerals, 5 January 2026. Accessed 26 Nov 2026.
- GN 84 of 2026, Mining (Minerals and Mineral Concentrates Trading) (Amendment) Regulations. Government Notice of 20 March 2026, copy hosted by FB Attorneys. Accessed 26 Nov 2026.
- Occupational Health and Safety Act, Cap. 297. TanzLII, consolidated 30 November 2019. Accessed 26 Nov 2026.
- Occupational Safety and Health Act, No. 8 of 2005 (Zanzibar). Government of Zanzibar, assented 27 September 2005. Accessed 26 Nov 2026.
- Contract mining report 2026. Grant Thornton Australia, 2026 edition, data to January 2026. Accessed 26 Nov 2026.
- Kiruswa: mine licence holders have no royalty mandate. Daily News via allAfrica, 4 November 2026. Accessed 26 Nov 2026.
- Zatra Tanzania Government Fees Register 2026. Zatra Consultants Limited, fees at 26 September 2026. Accessed 26 Nov 2026.
Figures to confirm before you act
- Holder keeps at least 30 percent of gross profit after royalty, inspection fee and levies (GN 260 reg 9)
- Royalty 6 percent, inspection fee 1 percent, HIV Response Levy 0.1 percent (register IDs F0624, F0625, F0626)
- PML annual rent TZS 90,000 a hectare for gold (register ID F0620)
- Withholding 2 percent on purchases from PML holders (register ID F0629)
- Withholding on services to mining 10 percent and on rent of construction equipment 10 percent (register IDs F0213, F0216)
- OSHA inspection fee for mining and quarrying TZS 160,000 to 1,440,000 (register ID F0442)
General information prepared by the Fursa365 deal desk, Zatra Consultants Limited. It is not legal, tax or investment advice and does not decide or guarantee any authority's outcome. Confirm current rules and fees with the authority named and your own advocate before you act. Mainland Tanzania is described; Zanzibar has separate laws and bodies.
Questions readers ask
Can a foreign contractor mine for a Tanzanian PML holder?
Only within narrow limits. The Commission may allow a PML holder to contract a foreigner for needed technical support not available locally. Local content rules then require a joint venture with a wholly Tanzanian-owned company holding at least 20 percent, and approval of that agreement. Foreign nationals on site need Commission and immigration authorisation.
Does the contractor or the licence holder own the ore?
The holder is the miner, so the ore is its property until sold through a licensed channel. A contractor may hold minerals only for the holder under section 18(1). The agreement should bar the contractor from selling, pledging or moving ore except to the named plant, market or dealer.
How long can a registered technical support agreement run?
GN 260 allows an initial term of up to three years from registration, with renewal sought three months before expiry. The Swahili text caps total renewals at twelve years and ties them to the licence term, while one law firm summary says ten. Check the Gazette copy and the licence expiry date.
What happens to the agreement if the licence is cancelled?
Under GN 260 reg 16, cancellation or non-renewal of the licence lets either party end the agreement on 30 days written notice. The contractor then removes its equipment as the agreement provides. Write the handover, final measurement and settlement of proceeds into the contract before work starts.
Is a share of output better than a rate per tonne?
It depends on who knows the ground. A rate gives the contractor steady income and leaves grade risk with the holder. A share rewards both sides when ore is rich and punishes the contractor when it is poor. Where GN 260 applies, the holder cannot receive less than 30 percent.
Does Fursa365 take a share of the mining proceeds?
No. Fursa365 never holds or handles money, and it is not a buying or selling marketplace. Listing and matching are free. If you engage Zatra as adviser under a PSFA, the success fee is a professional fee to Zatra Consultants Limited, separate from government fees.
Does this guide apply in Zanzibar?
No. It covers Mainland Tanzania, where the Mining Act, Cap. 123 and the Mining Commission apply. Zanzibar has its own laws on minerals, quarrying and workplace safety. Where a site or party is in Zanzibar, an advocate there must confirm the legal route before any agreement is signed.