Mining desk · Minerals

Katavi mining licences: what seven large cancellations mean for small miners.

What the Minister said in Mpanda, what was not announced, how cancellation works under the Mining Act and how small miners and partners can prepare without assuming ground will be released.

An open-pit mine at sunset with haul trucks on the ramp
DEAL DESK GUIDE
12minute read
9sources cited
8questions answered
Direct answer

What do the Katavi mining licence cancellations mean for small miners? On 13 November 2026 The Respondent reported that Minister Anthony Mavunde said seven large Mining and Prospecting Licences in Katavi will be cancelled and the ground given to small miners. No names, areas, dates or procedure were published. Cancellation needs a default notice and a 30-day remedy period, so treat release of ground as possible, not promised.

An open-pit mine at sunset with haul trucks on the ramp
Ground that sits undeveloped earns nothing. Whether any of it is released in Katavi is for the Minister and the Mining Commission to decide.

What was reported in Katavi

The story starts with The Respondent, published on 13 November 2026 under the headline "Katavi miners to benefit as seven large mining licences face cancellation". It reports that Minerals Minister Anthony Mavunde spoke while handing licences to nine groups of small-scale miners under the Mining Blocks for Transformation (MBT) programme. Mpanda District Commissioner Jamila Kimaro also spoke.

According to the report, seven large licences, a mix of Mining Licences and Prospecting Licences, are to be cancelled because the holders did not develop them. The government wants the ground returned and offered to small-scale miners, with attention to young people, women and people with special needs. The Minister also said serious large investors remain welcome in Katavi.

This guide covers Katavi only. For the national picture after the Tanzania Mining and Investment Conference, read our guide on idle mining licences and the export ban. We do not repeat it here.

Who should read this

Licensed small-scale miners and PML holders near Mpanda, Sitarike and the wider Katavi region. Groups of miners that want to apply for ground. Equipment owners, contractors and dealers who could serve those groups. Large licence holders in Katavi who want to understand their own exposure. Advocates and geologists advising any of them.

What did the Minister say, and what was not announced?

One outlet carries the Katavi report of 13 November. A second, independent report supports the direction. Michuzi Blog, on 3 October 2026, reports Mr Mavunde speaking at the close of the Mining Technology Exhibition in Geita. He said a review of undeveloped large licences had begun. He named the Sitarike area in Katavi as under review. He said released ground would go to small miners. The table separates what is reported from what is missing.

PointStatusSource
Seven large licences to be cancelled, Mining and Prospecting typesReportedThe Respondent, 13 November 2026
Reason: holders did not develop the groundReportedThe Respondent; Michuzi, 3 October 2026
Ground to go to small-scale miners, with priority groupsStated as intentThe Respondent
Names of holders, locations, sizes, mineralsNot announcedNone found
Whether notices were served, and whenNot announcedThe headline says "face" cancellation, the text says "ordered"
How released ground is advertised and who is selectedNot announcedNone found
Money, equipment or technical help for new holdersNot announcedThe report says benefit depends on capital and equipment
ZanzibarNot addressedNone found

We found no Ministry of Minerals or Mining Commission statement, press release or Gazette notice for this decision. The case rests on press reports of a ministerial statement. Treat it as a stated direction until the Commission publishes notices.

What the law says about cancelling a mining licence

The Act has no section called "idle licence". It sets start duties, and a holder who misses them is in default. The Mining Act, Cap. 123, is published as R.E. 2023 by the Government Printer, issued on 1 July 2025, in the OSG e-Library. The table of contents in that text lists section 74 as "Suspension and cancellation of mineral right" and section 76 as "Appeals".

The body wording we could read comes from the 2019 consolidation on TanzLII, where the same rules sit at sections 63 and 65. We could not read sections 74 and 76 in the R.E. 2023 body, so the wording below is marked verify.

StepRuleStatus
GroundsMaterial breach of the Act or regulations, breach of a licence condition or breach of a lawful direction (2019 s.63(1))Verify in R.E. 2023 s.74
Default noticeThe licensing authority must first serve a default notice stating the grounds (2019 s.63(2)(a))Verify
RemedyThirty days from service to remedy, or a longer period the authority allows (2019 s.63(2)(b))Verify
Commission adviceFor licences other than primary licences, the matter goes to the Mining Commission for advice (2019 s.63(2)(c))Verify
CancellationWritten notice; the holder's rights end but earlier liabilities remain (2019 s.63(3) and (7))Verify
ChallengeJudicial review in the High Court within sixty days of the decision (2019 s.65(1))Verify in R.E. 2023 s.76

Start duties in R.E. 2023, as read in our earlier guide, are three months for a prospecting licence (s.46(1)) and eighteen months for a mining licence (s.62). A holder can dispute a notice. Disputes, appeals and judicial review go to an advocate.

How long does cancellation take?

The Act sets two clocks and leaves the rest open. The statutory minimum is the default notice plus thirty days. The Commission's advice step has no stated time limit in the text we read. A challenge in court may follow within sixty days of a decision.

StageTimeWho acts
Notice servedDay 0Licensing authority
Holder's remedy window30 days, or longer if allowedHolder
Commission advice (non-primary licences)No period statedMining Commission
Cancellation noticeAfter the aboveLicensing authority
Judicial review window60 days from the decisionHolder, through an advocate
Ground made available to othersNo process or date publishedMinistry and Commission

Past cases show how the notice is used. TanzaniaInvest, on 7 May 2025, reported the Minister's budget figures. Between July 2024 and March 2025 the Commission issued 8,501 licences, revoked 14 (five prospecting and nine mining) and gave default notices to 118 prospecting licences, 41 medium-scale mining licences and 95 large and medium holders that had not started within eighteen months. In April 2026, TanzaniaInvest reported that 40 exploration licences were cancelled and 43 more holders were given 30 days.

Does cancellation make the ground free for small miners?

Not automatically. Cancellation ends the old holder's rights. It does not by itself say who may apply next. We found no rule, notice or Commission guidance on how Katavi ground would be reopened, advertised or allocated.

Three signals point to allocation by programme rather than first-come application. The Respondent links the Katavi plan to the MBT programme, under which nine groups received licences at the ceremony. HabariLeo, on 24 December 2025, reported Mr Mavunde saying licences will go to groups, not single persons, and that unused licences will be cancelled. A previous STAMICO-held licence was reportedly taken back for small miners.

Fursa365 does not promise that any Katavi ground will be released, to whom, or when. Plan for both outcomes. Build the group and the paperwork now, and continue working on ground you already hold.

Who can apply for a primary mining licence, and what do the rules require?

The 2019 text of the Act, at section 8(2), grants a primary mining licence only to individuals, partnerships or bodies corporate that meet the citizenship and control tests. In practice the PML is for Tanzanian citizens and companies owned by citizens. Our guide on partnering on a PML covers the ownership checks and the nominee trap. Foreign money or control behind a citizen name puts the licence at risk.

The licence term in the 2019 text is seven years (s.55(2)), which we mark verify for R.E. 2023. Section 8(7) of the 2019 text bars a grant to a person with an unremedied default or cancelled rights, except on rectifying the default. A group should therefore have its existing licences in good standing before it applies for more.

Headlines in February 2025, such as Nipashe on 17 February 2025, report a ministerial ban on outsiders entering small-scale licences. We have not read the amending regulation. Ask the Commission for its text before you sign any arrangement with a non-citizen.

Can a mining licence be sold or transferred to a partner?

Only within strict limits. Licences are not freely transferable. Under the Mining Act, Cap. 123 R.E. 2023, section 10(2), a Special Mining Licence or Mining Licence, or an undivided part of either, "shall not be assigned to another person without a written consent of the licensing authority". Section 10(4) refuses consent unless substantial development is shown, a Tax Clearance Certificate exists and other charges are cleared. Section 10(3) lists exceptions, including a charge to a bank as security. We read this in the R.E. 2023 text. The 2019 text carries the same rule at section 9(2).

A cancelled licence cannot be sold at all. A licence under a default notice is a weak asset, since the buyer inherits the breach. Fursa365 does not broker licences and does not take part in licence sales. The loan security guide covers pledging.

The Commission's transfer fee is USD 3,000 for a right other than a PML (register ID NEW-06-16) and TZS 500,000 for a PML (register ID F0619).

How can small miners and partners work around ground that may be released?

Prepare, contract and wait. None of the routes below depends on ground being released, and none moves a licence.

RouteWho does whatLicence moves?Main check
Group formationMiners form a registered group or company of citizens, ready for allocationNoBeneficial owners disclosed; no nominees
Contract mining on a current licencePartner supplies plant and crew; holder supplies licence and siteNoWritten start date and measurement terms
Equipment hireOwner hires excavator, crusher or trucks at a day rateNoInsurance, title, lender consent; see hire-out guide
OfftakeA licensed dealer commits to buy outputNoDealer licence; see offtake guide
Joint ventureHolder and partner share costs and outputOnly if assigned, which needs consentSee mining JV guide
Exploration fundingFunding for survey workNoSee mineral survey fund guide

Do not pay anyone for a promise of ground. No person can sell Katavi ground that the Commission has not released. Any request for an advance against a future licence is a screening failure on Fursa365.

A worked example: a six-member group in Mpanda

Illustrative figures, not a quote. Six citizens in Mpanda form a company to apply for gold ground, should the Commission open any. They hope for a 5 hectare PML. Fees come from the register. Sales are an assumption, not a forecast.

ItemWorkingAmount (TZS)
PML application (F0619)Fixed fee50,000
PML preparation (F0619)Fixed fee50,000
Annual rent, gold (F0620)5 ha at 90,000 (minimum 180,000 applies under 2 ha)450,000
Assumed monthly gold salesIllustrative60,000,000
Royalty at 6% (F0624)6% of 60,000,0003,600,000
Inspection fee at 1% (F0625)1% of 60,000,000600,000
Withholding on purchase from a PML holder at 2% (F0629)2% of 60,000,0001,200,000

The group has no excavator. An equipment owner offers a 20 tonne excavator on hire, and a licensed dealer offers to buy. Both sit outside the licence. The group pays government charges at the official rate and then pays the hire rate and fuel from net proceeds. Zatra's professional fee under a PSFA is a separate bucket, and the group's accountant confirms tax. The group keeps the hire and offtake contracts conditional on the licence being granted, so a refusal costs nothing.

Mainland or Zanzibar: which rules apply?

PointMainland TanzaniaZanzibar
Mining Act, Cap. 123Applies; Katavi is a Mainland regionNot verified; mineral matters there are separate
Licensing bodyMining CommissionUnknown; confirm with a Zanzibar advocate
Katavi announcementReported for Katavi onlyNot addressed

A deal touching Zanzibar needs an advocate admitted on that side and a separate check.

What to do now

  1. Check your own licence. Print the Mining Cadastre status, the grant date and the latest rent receipt. A holder in Katavi should also check whether a default notice has been served and work out the start date from the grant date.
  2. Answer any notice in 30 days. Send evidence of work and a start date. An advocate handles any dispute, appeal or judicial review.
  3. Form the group. Register a company of citizens, record every beneficial owner and open a bank account in the group's name.
  4. Ask the Mining Commission and the Zonal Mining Office. Ask in writing how released Katavi ground will be advertised and who may apply. Keep the reply.
  5. Keep working on current ground. Dated photographs, payroll and sales records show diligence and help any later application.
  6. Price the government charges. Rent, royalty, inspection fee and withholding come from the register at the official rate. An accountant such as CPA Altho Mwangoa confirms tax.
  7. Get your own expert reports. Instruct a geologist and surveyor yourself, not through the counterparty.
  8. List on Fursa365. Post the group, the equipment, the offtake need or the funding offer on the idle assets room or in business deals, with an end date.
  9. Match and sign the NDNCA. Review the verified counterparties Zatra proposes, and sign the NDNCA before names move.
  10. Sign an advocate-drafted agreement that is conditional on any licence being granted.

Key dates

DateEventSource
2 May 2025Minister reports 14 revocations and 95 default noticesTanzaniaInvest, 7 May 2025
24 December 2025Licences to groups, unused licences to be cancelledHabariLeo
15 April 202640 exploration licences cancelled; 43 holders given 30 daysTanzaniaInvest, 16 April 2026
3 October 2026Review of undeveloped licences; Sitarike namedMichuzi Blog
13 November 2026Seven Katavi licences reported to face cancellationThe Respondent
Notice plus 30 daysRemedy periodMining Act, 2019 s.63 (R.E. 2023 s.74, verify)
Decision plus 60 daysJudicial review windowMining Act, 2019 s.65 (R.E. 2023 s.76, verify)

No date has been published for the Katavi notices or any reallocation.

How Zatra helps

Zatra Consultants Limited screens a group's ownership, a holder's licence file and a partner's capacity, verifies identity and licence status before a match, and structures the contract, hire, offtake or joint venture as the client's adviser under a PSFA. The group runs in order: Fursa365 matches, Zatra structures, NEMBO packages and Kasongo Auction Mart auctions. Zatra does not insure, license, value, lend or hold money, and does not decide or guarantee any authority's outcome. The Mining Commission decides licence matters.

Two cost buckets stay apart. Government fees at the official rate are paid to the authority and listed in the government fees register. Zatra's professional fee is separate and is not brokerage. Fursa365 is not a marketplace and does not deal in minerals or licences, as the regulatory boundaries page says. See also verification, project participation, deal rounds and the NDNCA explainer. Ownership checks are in the Zatra ownership guide. Disputes, seizure, prosecution and legal opinions go to an advocate. Zatra Consultants Limited is the PDPC-registered data controller.

Sources and status

Accurate as at 24 Nov 2026. Figures are from the sources below and from the Zatra government fees register, quoted with their register IDs so they can be checked line by line.

Figures to confirm before you act

  • Whether default notices have been served on the seven Katavi licences, and their dates (not announced)
  • Section numbers 74 and 76 of R.E. 2023 and their 30-day and 60-day wording (read in the 2019 text as ss.63 and 65)
  • Transfer consent rule, R.E. 2023 s.10(2) and (4)
  • PML application and preparation TZS 50,000 each; transfer TZS 500,000 (register ID F0619)
  • PML annual rent for gold TZS 90,000 per hectare, minimum TZS 180,000 (register ID F0620)
  • Royalty 6% (F0624), inspection fee 1% (F0625), withholding 2% on purchases from PML holders (F0629)
  • Transfer of a right other than a PML USD 3,000 (register ID NEW-06-16)
  • How released ground will be advertised and allocated (unknown)

General information prepared by the Fursa365 deal desk, Zatra Consultants Limited. It is not legal, tax or investment advice and does not decide or guarantee any authority's outcome. Confirm current rules and fees with the authority named and your own advocate before you act. Mainland Tanzania is described; Zanzibar has separate laws and bodies.

Questions readers ask

Has the government published the Katavi licence cancellations?

Not that we found. The report rests on a ministerial statement carried by the press. No Gazette notice, holder names or areas were public on 24 November 2026. Ask the Mining Commission or the Zonal Mining Office in writing for current status.

Which licences are affected?

The report says seven large licences, a mix of Mining Licences and Prospecting Licences. It does not name them. Primary mining licences held by small miners were not mentioned as targets.

Can I apply now for ground in Katavi?

There is no published window or process for released ground. Applications for new rights go through the Mining Commission as usual. Ask the Commission whether any block is open before paying anyone or building plans on it.

Can a cancelled holder keep the ground?

Only by remedying the default within the notice period or by challenging the decision in court within the time the Act allows. An advocate advises on that route. Cancellation ends the holder's rights from the date of the notice.

Can a partner buy a licence that faces cancellation?

Transfer of a Mining Licence needs written consent, and consent depends on proof of development and tax clearance. A licence under default is a poor purchase. Contract or hire instead, and leave the licence with its holder.

Do foreign investors qualify for released small-scale ground?

A primary mining licence is for citizens and citizen-owned companies. Foreign investors can supply equipment, funds or offtake under written contracts, subject to the Commission's current rules. A nominee arrangement is a screening failure.

Will Fursa365 get me a licence?

No. Fursa365 does not issue, sell or broker licences, and it does not decide any authority's outcome. It matches verified offers, such as equipment, offtake and joint ventures, to verified demand, and Zatra structures the deal.

What does it cost to list and match on Fursa365?

Listing and matching are free. If you engage Zatra to structure a deal, that is a professional fee under a PSFA, separate from government fees. Fursa365 never holds your money.

Seen an error or a changed fee? Write to [email protected] with the guide title and the line. The desk reviews every guide quarterly and on any change in the law.
Dennis Wilson, Zatra Consultants Limited
Dennis WilsonChief Operating Officer, Zatra Consultants Limited

Engineer. Execution of registrations, licences and authority follow-up. Ten years in operations and industrial engineering.

Ready to act on this guide?

Submit a qualified offer or a verified request. Zatra screens it; only verified counterparties ever see it.